Basic Rigging – (3 to 4 Hours)
- Risk Management
- Inspection and Removal – Slings & Hardware
- Inspection frequency and documentation requirements
- Inspection of wire rope, chain, web and round slings – ASME B30.9
- Inspection of hardware – ASME B30.26
- Rejection criteria
- Removal Procedure
- Load Weight & Center of Gravity
- Taglines
- Hitches & Load Control
- Understanding Sling Tension
- Evaluating Rigging Problems at the start
- The Rigging Plan
- What’s wrong with my rigging?
Signal Person – (Approximately 3 Hours)
- Hand Signals
- Operations and Limitations
- Signal Person Requirements
- OSHA 1926.1400
- ASME B30.3
- ASME B30.5
- ASME B30.23
- Written and Practical Examination for Qualified Signal Person per Subpart CC (1926.1419 – 1926.1422; 19.26.1428)